鎧裝電纜隔爆/防水接頭
鎧裝電纜隔爆/防水接頭詳細(xì)介紹
產(chǎn)品型號名稱:
特點參數(shù):是配套鋼絲鎧裝電纜,鋼帶鎧裝電纜等特殊電纜配套使用的配套鋼絲鎧裝電纜防水接頭,鋼帶鎧裝電纜防水接頭,用于鎧裝電纜終端接線或進(jìn)入接線盒或設(shè)備時鎖緊鎧裝電纜的。歡迎采購。現(xiàn)已經(jīng)廣泛用于核電,石化,采礦等行業(yè),除常規(guī)產(chǎn)品外,本公司還提供進(jìn)口防爆鎧裝電纜防水接頭,隔爆鎧裝電纜防水接頭,ATEX認(rèn)證,EX認(rèn)證,CE認(rèn)證等認(rèn)證齊全,可以在氣體 1區(qū), 2區(qū),粉塵 20區(qū), 21區(qū), 22區(qū)使用,。
一,
在Ex-E,EX-D和前TA領(lǐng)域使用的危險區(qū)域,包括的IECEx認(rèn)證和ATEX認(rèn)證,鎧裝電纜的電纜接頭 |
Available in the following Thread Types:可在以下螺紋類型: | | | |
| - Innovative "Interlocking Armor Cone"創(chuàng)新“聯(lián)鎖鎧甲錐”
- Zero torsion on cable cores and armor零扭轉(zhuǎn)電纜芯線和裝甲
- Fast and easy pre-assembly by hand by the use of profile material with maximum grip快速和容易的預(yù)裝配型材zui大的抓地力手
|
| - The Exios Barrier combines outstanding Exios features with flameproof compound.隔爆型復(fù)合Exios屏障結(jié)合特色突出Exios。 Whenever installation requires a barrier gland (IEC 60079-14 / 10.4.2), your solution is Exios Barrier.每當(dāng)安裝需要一個障礙腺(IEC 60079-14 / 10.4.2),您的解決方案是Exios屏障。
|
| - According to the latest IECEx and ATEX standards根據(jù)的IECEx和ATEX標(biāo)準(zhǔn)
- Ex-d / Ex-e / Ex-ta前-D / EX-E / EX-TA
- Zone 1, Zone 2, Zone 20, Zone 21 und Zone 22 1區(qū),2區(qū),20區(qū),21區(qū)和22區(qū)
- Gas Groups IIA, IIB and IIC – Apparatus Group III燃?xì)饧瘓F(tuán)IIA,IIB和IIC - 儀器第三組
- Equipment Protection Level GbDa設(shè)備防護(hù)等級GbDa
- Ex IM2 Ex de I Mb IIC Gb / Ex ta IIIC Da前IM2的前德我MB IIC GB / EX TA IIIC部大
|
- IP 66, 67 and 68 (5 bar), EN 60529符合EN 60529 IP 66,67和68(5條)
- Temperature Range - 60°C to 85°C (- 76°F to 185°F)溫度范圍 - 60°C至85°C( - 76°F到185華氏度)
- Halogen- and phosphorous-free無鹵素和磷
- Silicone Seals and O-Rings as standard硅膠密封圈和O形圈作為標(biāo)準(zhǔn)
|
詳細(xì)參數(shù) |
材料 | 原材料黃銅,鍍鎳黃銅,黃銅與NPB的主題和316不銹鋼(可根據(jù)要求定做) |
密封件/ O形圈 | 有機硅,VQM |
夾緊插入 | PA 6 Fire Protection Class V2 per UL 94 |
盔甲 | 金屬裝甲 |
溫度范圍 | -76°F to 221°F (-60°C to +105°C) |
防護(hù)等級 | IP 68 / 5 bar |
可用尺寸 | 公制:M16,M20,M25,M32,M40,M50,M63,M75 NPT:3/8“,1/2”,3/4“1”,1-1/4“,1-1/2”,2“,2-1/2”,3“ |
安裝指南:
| Components: 1. Entry Component 2. Compound Sleeve 3. Interlocking Armor Cone 4. Armor Clamping Ring 5. Gland Body 6. Outer Jacket Sealing 7. Dome Nut 8. Compound | Certification Details: Operating temerature rage - 60°C to 85°C (- 76°F to 185°F) Ingress protection rating IP 66, 67, 68 (5bar) Gland Type: EXIOS Barrier I M2 Ex d Mb / Exe I Mb II 2G Ex d IIC Gb / Ex e IIC Gb II 1d eX TA IIIC Da IP 66 /67/68 IECEx: Nr. Sir 11.0044X ATEX: Nr. Sira ATEX 1110X EN/IEC 60079-0/2009 EN/IEC 60079-1/2007 EN/IEC 60079-7/2007 EN/IEC 60079-31/2009 EN 60529 | | | Step 1 The cable is to be prepared as shown in Fig. 1. For L1 dimension see table. Choose measurement L2 depending on the installation. The inner cable jacket (A2) must be free of damage and should extend beyond the cable gland. Important: The Exios Barrier Cable Gland is typically designed for use with armored cables. However it is also possible and permitted to use with NON-ARMORED cables. In this case it is important to use one clamping ring as a spacer for the installation! | | Step 2 The cable gland is delivered with 2 armor clamping rings. Choose the appropriate clamping ring (measure armor thickness and see Table 1); the other ring can be discarded. Follow the installation instructions shown in Fig. 2. Pay attention to the correct installation of the clamping ring, Fig. 3. The arrow on the clamping ring should point towards the installation. Step 3 Install the entry component on the device or housing (∼15Nm / 11.6 foot pounds). The end-user is responsible for ensuring that, at the point of installation, the adapter for the entry component has been made ready in accordance with Regulations. The entry component can be provided with a locknut to keep it from working loose. | | Step 4 Position the armour of the cable so that all parts of the armor are in contact with the armor cone (Fig. 4) and the ends of the armor touch the edge of the armor cone. Now screw the gland body hand-tight onto the entry component. It helps if, while doing so the cable is pushed slightly in towards the device or housing. With the appropriate open-ended spanner (tool), tighten fast in order to securely clamp the armor. | | Step 5 Loosen the gland body and check for correct seating of the armor (Fig. 5). The armor must be firmly clamped. If need be, repeat step 4. Preparing the Compound: Please check the compound expiration date. Read the attached Safety Data sheet. Use the protective gloves included, as well as suitable eye protection. The compound can be applied at temperatures between +10C and + 40C. Application is ideally carried out at room temperature (+20C). Processing time is approx. 15 min. Please see Table 2 for Cure Time of the Compound. | | Step 6 Mix and knead the appropriate quantity of compound for the job until a compley uniform color is achieved. As shown in Fig. 6, apply the compound between and around the individual conductors. To prepare for the sleeve (cover) it is easy if the compound has first been giving a conical shape as in Fig. 7. To stop the conductors moving out of place, they can be held together with scotch tape. | | Step 7 Push sleeve over compound portion behind armor cone. This causes the compound to be compressed. Remove the excess compound. Care should be taken that sleeve has been filled right up to the end. The outside of the sleeve is to be kept clean. | | Step 8 The cable can now be inserted into the entry component. The sleeve should be inserted carefully. | | Step 9 After the entry component and the gland body have been screwed together again (Step 4, Nm), the dome nut can now be tightened. To speed up assembly, it can be tightened by hand to start with. Then tighten down using an open-ended spanner (Nm). | |
二,非隔爆防爆鎧裝電纜接頭:
| - "創(chuàng)新“聯(lián)鎖鎧甲錐”
- 零扭轉(zhuǎn)電纜芯線和裝甲
- 快速和容易的預(yù)裝配型材zui大的抓地力手
|
| - 雙密封在內(nèi)部和外部電纜護(hù)套
護(hù)甲接受的范圍從0毫米 - 2.5毫米 - zui大夾持范圍
|
| - 根據(jù)的IECEx和ATEX標(biāo)準(zhǔn)
- Ex-d / Ex-e前-D / EX-E
- Zone 1, Zone 2, Zone 20, Zone 21 und Zone 22 :1區(qū),2區(qū),20區(qū),21區(qū)和22區(qū)
- Gas Groups IIA, IIB and IIC – Apparatus Group III燃?xì)饨MIIA,IIB和IIC - 儀器第三組
- Equipment Protection Level GbDa設(shè)備防護(hù)等級GbDa
|
- IP 68 5 bar, EN 60529 :IP 68 5巴,EN 60529標(biāo)準(zhǔn)
- 溫度范圍-76°F至221°F(-60°C至+105°C)
- 無鹵素和磷
- 標(biāo)準(zhǔn)硅膠密封圈和O形圈
|
We Can Cross:我們可以超越: | |
Download - 4 Page Flyer 下載- 4頁資料 |
詳細(xì)參數(shù) |
材料 | 原材料黃銅,鍍鎳黃銅,黃銅與NPB的主題和316不銹鋼(可根據(jù)要求定制) |
密封件/ O形圈 | Silicone,有機硅,VQM |
夾緊件 | PA 6尼龍塑料 防火等級:V2 UL 94 |
盔甲 | 金屬裝甲 |
溫度范圍 | -76°F to 221°F (-60°C to +105°C) -76°F至221華氏度(-60°C至+105°C) |
保護(hù)等級 | IP 68 / 5 bar IP 68/5巴 |
可用尺寸 | 公制:M16,M20,M25,M32,M40,M50,M63,M75 |
防爆鎧裝電纜接頭安裝指南:
|
Components: 組件: 1. 項組件 2.內(nèi)夾克密封的 3. 聯(lián)鎖鎧甲錐 4. 護(hù)甲夾緊環(huán) 5. 腺體 6.外套密封 7. 圓頂螺母 | 認(rèn)證詳情: 電纜接頭類型:EXIOS II 2G Ex de IIC Gb / II 1D Ex ta IIIC Da,IECEx: Nr. IECEx認(rèn)證:NR。 BVS 10.0078X BVS 10.0078X ATEX: Nr.防爆:NR。 BVS 10 ATEX E062X BVS 10 ATEX認(rèn)證E062X EN/IEC 60079-0/2009 EN/IEC 60079-1/2007 EN/IEC 60079-7/2007 EN/IEC 60079-31/2009 EN 60529 EN | |
| 第1步 電纜接頭是要準(zhǔn)備圖所示。 1. 看到的L1尺寸表。 .選擇適當(dāng)?shù)拈L度。 電纜護(hù)套(A2)的必須是無損害的,應(yīng)超出電纜壓蓋。 |
| 第3步 安裝在設(shè)備上的入境組件或住房(?15NM / 11.06英尺磅))。 zui終用戶是負(fù)責(zé)確保安裝點,為進(jìn)入組件適配器符合規(guī)定的。條目組件可以提供一個鎖緊螺母,以保持它轉(zhuǎn)向?qū)捤伞?/span> |
| 第4步 .位置的電纜的鎧甲,使所有的零部件接觸裝甲錐(圖4)和裝甲觸摸兩端的邊緣的裝甲錐是裝甲。 .手頭緊,到進(jìn)入組件擰腺體。 這樣做時,它可以幫助如果電纜被壓在對設(shè)備或房屋輕微。適當(dāng)?shù)拈_放式扳手(工具),以裝甲安全鉗擰緊。 |
| 第5步 開的腺體和檢查裝甲正確定位(圖5)。 裝甲必須牢牢夾住。 4.如果需要,重復(fù)步驟4。 |
| 第6步 .入世后組成部分,腺體已再次擰緊(步驟4米),圓頂螺母,現(xiàn)在可以收緊。了加快組裝,也可以用手?jǐn)Q緊開始。 |
鎧裝電纜防爆/防水接頭常規(guī)規(guī)格型號表如下:安裝指南請咨詢
三,其他常規(guī)/防爆電纜接頭如下:
若需要其他材質(zhì),如:尼龍塑料,PVDF,黃銅鍍鎳,不銹鋼,鋅合金,
其他螺紋制式,如:M螺紋,PG螺紋,NPT螺紋,G螺紋,
其他要求,如:加長,防折,抗拉,多孔,扁平,直角,EMV,EMC電磁兼容,耐高溫,耐低溫,耐高壓,防爆,隔爆,鎧裝。
附件,如:堵頭,變徑。
索取選型資料。
材料 | 黃銅、鍍鎳 |
花鍵鑲嵌件 | PA |
成型包裝 | NBR |
O型圈 | NBR |
防護(hù)級別 | IP 68 – 10 棒 / IP 69K 夾持范圍內(nèi) |
連續(xù)運行溫度 | -40 °C – 100 °C |
材料 | PA V0符合UL 94標(biāo)準(zhǔn) |
成型包裝 | NBR |
防護(hù)級別 | IP 68 – 10 巴 / IP 69K 夾持范圍內(nèi) 僅帶可選O型圈 |
連續(xù)運行溫度 | -40 °C – 100 °C |
交貨顏色 | 灰色 RAL 7035 |
螺母
電纜直徑以mm(毫米)計算
廣州興工智能科技有限公司
:(10線)
答疑1:2693332967
答疑2:2294758553